Vendors
Register as a Vendor
Avant-Garde India continues to associate with a wide pool of Vendors. Kindly refer to our vendor registration criteria below and please send your request to vendor@avant-garde.co.in
Vendor Registration Criteria
- Should have been active in past 3 years.
- Supply record for at least eight reputed clients doing civil works as major business, out of which at least three in last two years
- Should have qualified staff for doing the in house design and detailing
- Should have single order value of at least 25 lakhs and above in one single year
- Preference will be given for owning their manufacturing unit and having experienced technicians for field installations
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
CONCRETE ADMIXTURES
- Should have been active in past 3 years.
- Supply record for at least eight reputed clients doing civil works as major business, out of which at least three in last two years
- Should have single order value of at least 5 lakhs and above in one single year
- Preference will be given for owning their manufacturing unit
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
FALSE CEILING & FALSE FLOORING
- Should have been active in past 3 years.
- Supply record for at least eight reputed clients doing civil works as major business, out of which at least three in last two years
- Should have single order value of at least 5 lakhs and above in one single year
- Preference will be given for owning their manufacturing unit and having experienced technicians for on site installations
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
COATED STEEL ROOF & CLADDING SHEETS & LIGHT-GAUGE STEEL PURLINS
- Should have been active in past 3 years.
- Supply record for at least eight reputed clients doing civil works as major business out of which at least three in last two years
- Should have single order value of at least 5 lakhs and above in one single year
- Preference will be given for owning manufacturing unit
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
RCC CHIMNEY ENGINEERING SERVICES (DESIGN CAPABILITY)
- Design & Detailed engineering services for at least 8 Chimneys of at least 60m height each
- Should have own software to design the chimney
BOILER SUPPORT STRUCTURAL DRAFTING SERVICES
- Structural steel Detailing for at least 5 boiler support structures
- Preference will be given for possession and use of TEKLA Software for steel detailing
SWITCHYARD-CIVIL & STRUCTURES ENGINEERING SERVICES (DESIGN CAPABILITY)
- Design & Detailed engineering services for at least 5 switchyard civil & structural works including design
- Should have STAAD PRO software and in-house software for design and qualified team of staff to design and do drafting separately
POWER PLANT CIVIL ENGINEERING SERVICES (DESIGN CAPABILITY)
- Design & Detailed engineering services for at least four projects on power plant civil works
- Should have STAAD PRO software and qualified team of staff to design and do drafting separately
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
BUILDING & PIPE RACK STRUCTURAL STEEL DRAFTING SERVICES
- Structural Steel Detailing for at least 5 structural steel projects involving steel buildings and pipe rack supports.
- Preference will be given for possession and use of TEKLA Software for steel detailing
WATER PROOFING & LEAK ARREST
- Should have been active in past 3 years.
- Work completion for at least eight projects, out of which at least four project in last two years
- Should have executed at least one project of Rupees 5 Lakhs and above in Last 3 years
- Preference will be given for owning their manufacturing unit and having experienced technicians for on site applications
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
NON-CONVENTIONAL WEATHERING COARSE
- Should have been active in past 3 years.
- Work completion for at least eight projects, out of which at least four project in last two years
- Should have executed at least one project of Rupees 5 Lakhs and above in Last 3 years
- Preference will be given for owning their manufacturing unit and having experienced technicians for on site applications
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
REINFORCEMENT COATING
- Should have been active in past 3 years.
- Work completion for at least four projects, out of which at least two projects previous year
- Should have executed at least one project of Rupees 5 Lakhs and above in Last 3 years
- Preference will be given for owning their unit
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
MATERIAL TESTING
- Should have been active in past 3 years.
- Work completion for at least four projects, out of which at least two projects previous year
- Should have executed at least one project of Rupees 1 Lakh and above in Last 3 years
- Preference will be given for owning their testing equipments and having experienced staff to assess and work at site
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan including calibration schedules
ANT-VIBRATION MOUNTINGS
- Should have been active in past 3 years.
- Work completion for at least four projects, out of which at least two projects previous year
- Should have executed at least one project of Rupees 3 Lakhs and above in Last 3 years
- Preference will be given for owning manufacturing facility and qualified staff for attending the field installation
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
VACUUM DEWATERED FLOORING
- Should have been active in past 3 years.
- Work completion for at least four projects, out of which at least two projects previous year
- Should have executed at least one project of Rupees 5 Lakhs and above in Last 3 years
- Preference will be given for owning their equipment
- Should have own organisational Quality Assurance Plan
- Should have been active in past 3 years.
- Work completion for at least 5 projects, out of which at least two in last two years
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
- Should be in possession of their own drilling rig
- Should have been active in past 3 years.
- Work completion for at least 5 projects, out of which at least two in last two years (out of which at least one is for survey of 25 acres minimum area)
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
- Should be in possession of own Total Station Equipment.
RCC CHIMNEY
- Should have been active in past 3 years.
- Work completion for at least 8 Chimneys, out of which at least three in last two years (each of at least 60m height)
- Should have executed at least one project of Rupees 1 crore and above in Last 3 years
- Should be owning their own slipform equipment capable of making tapered chimney.
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan and Safety standards
STEEL CHIMNEY FABRICATION & ERECTION CONTRACTOR
- Should have been active in past 3 years.
- Work completion for at least 5 Chimneys, out of which at least two in last two years (each of at least 30m height)
- Should have executed at least one project of Rupees 25 lakhs and above in Last 3 years
- civil chimney new test
POWER PLANT CIVIL WORKS CONTRACTOR
- Should have been active in past 3 years.
- Work completion for at least four projects on power plant civil, works out of which at least one project in last two years
- Should have executed at least one project of Rupees 8 crores and above in Last 3 years
- Preference will be given for owning their mini batching plant.
- Preference will be given if ISO certified. Should have own organizational Quality Assurance Plan
PILING CONTRACTOR
- Should have been active in past 3 years
- Work completion for at least eight projects for piling for civil works, out of which at least three project in last two years
- Should have executed at least one project of Rupees 50 lakhs and above in Last 3 years
- Should possess their own piling rig capable of drilling through rock also.
- Preference will be given if ISO certified. Should have own organisational Quality Assurance Plan
COMPLETE POWER PLANT EPC
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
BTG PACKAGE EPC
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
BOP PACKAGE EPC
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
AIR COOLED STEAM CONDENSERS WITH ALUMINUM FINS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
AIR COOLED STEAM CONDENSERS WITH CSHDG FINS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
BLEED / EXTRACTION CUM CONDENSING STEAM TURBINE
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
BACK PRESSURE STEAM TURBIN
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
INJECTION STEAM TURBINE
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
RE-HEAT STEAM TURBINE
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
ORGANIC VAPOUR TURBINES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
GRATE FIRED BOILER & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
ATMOSPHERIC FLUIDIZED BED COMBUSTION BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
CIRCULATING FLUIDIZED BED COMBUSTION BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
SPENT WASH FIRED BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
MSW / RDF FIRED BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
WASTE HEAT RECOVERY BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
OIL FIRED BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
GAS FIRED BOILERS (BFG, COG, BIOGAS, NATURAL GAS, ETC) & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
FLUE TUBE BOILERS & AUXILIARIES
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum three (3) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast two (2) installations installed with in last three (3) years.
AXIAL FANS FOR ACC APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
AXIAL FANS FOR ACC APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
AXIAL FANS FOR ACC APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
HP/LP HEATERS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
GEAR BOX FOR STEAM TURBINE APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
SURFACE STEAM CONDENSER FOR TG APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
HEAT EXCHANGERS – PLATE, SHELL & TUBE
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
EJECTORS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
OIL CENTRIFUGE FOR TURBINE APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
LUBE OIL SYSTEM FOR TURBINE APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
HIGH SPEED / LOW SPEED COUPLINGS FOR TURBINE APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
RUPTURE DISC
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
ELECTRO STATIC PRECIPITATOR (ESP) FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
BAGFILTER FOR BOILER FLUE GAS APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
FLUE GAS CLEANING SYSTEM FOR SOX, NOX, DIOXINS, ETC
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
WET SCRUBBERS FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
CYCLONES / MULTICLONES FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
FUEL OIL & GAS HANDLING SYSTEM
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
FUEL OIL PUMPING & HEATING UNITS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
OIL / GAS BURNER & AUXILIARIES FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
FUEL OIL HEAT TRACING SYSTEM
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
FUEL TANKS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
INSULATION, REFRACTORY BRICKS, CASTABLES & CERAMIC WOOL MATTRESSES FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
CERAMIC WOOL MATTRESSES FOR BOILER APPLICATION
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
LONG RETRACTABLE SOOT BLOWERS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
RETRACTABLE SOOT BLOWERS
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
TRAVELLING GRATE SYSTEM
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
DUMP GRATE SYSTEM
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
PUSHER GRATE SYSTEM
- Should be a manufacturer of the respective equipment with minimum five (5) years experience.
- Should have supplied the respective equipment to minimum five (5) clients in last three (3) years.
- Should submit the performance certificate from the customer for atleast three (3) installations installed with in last three (3) years.
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied to min Three (3) Biomass/Bagasse based power Plant Projects in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied to min Three (3) Biomass /bagasse based power Plant Projects in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied to min Five (5) material handling system Projects in last Three years for belt width of min 800 mm and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied to min Five (5) coal handling system Projects of each 50 TPH capacity & above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied to min Five (5) bagasse based co-gereration plants for bagasse handling system application with 60 Tons breaking strength capacity in last Two years and are working satisfactorily. Proof shall be submitted in the form of certificate
Â
- Should be a manufacturer with minimum five (5) years experience.
- Should have testing facilities to carryout the test as per IS:1891.
- Should have supplied to min Five (5) Thermal power plants/Captive power plants for coal handling system application in last three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied min Ten (10) nos. for min 500 mm belt width in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should have supplied minimum of Five (5) nos. each 75 Tons min capacity for coal handling system application in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client
- Should be a manufacturer with minimum five (5) years experience
Should be a manufacturer with minimum five (5) years experience
Should have supplied minimum of Five (5) nos. each 75 Tons min capacity for coal handling system application in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of Five (5) nos. each 75 Tons min capacity for coal handling system application in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of Three (3) Crab cranes of 20-30 Mtr Span in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of Five (5) cranes of 10-12 Mtr Span with 10-15 Tons capacity in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of two (2) Dense phase ash handling system for Bagasse based Cogeneration Power plant in the last Five years.
- Should have supplied min Three (3) Dense phase Pneumatic conveying system each 50 Lakhs value and above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end use
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of Five (5) cranes of 15-20 Mtr Span with 50-80 Tons capacity in the last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of two (2) Biomass handling system for Biomass power plant in the last Five years.
- Should have supplied min Three (3) material handling system each 50 Lakhs value and above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of two (2) bagasse handling system for Bagasse based Cogeneration Power plant in the last Five years.
- Should have supplied min Three (3) material handling system each 100 Lakhs value and above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have supplied minimum of two (2) ash handling system for power plant in the last Five years.
- Should have supplied min Three (3) material handling system each 50 Lakhs value and above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience .
- Should have supplied minimum of two (2) coal handling system for CPP/Cement Plant/Steel plant in the last Five years
- Should have supplied min Three (3) material handling system each 100 Lakhs value and above in last Three years and are working satisfactorily. Proof shall be submitted in the form of certificate obtained from the respective client /end user.
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of similar or higher capacity of 300 gm/hr chlorine dioxide generation system.
- Should have minimum two (2) systems of similar or higher capacity & similar type for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective c
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
DETECTORS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
MANUAL CALL POINT
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HOOTERS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
FIRE ALARM PANEL
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DELUGE VALVE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
SPRAY NOZZLES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
LINEAR HEAT SENSING CABLE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DIESEL ENGINE CONTROL PANEL
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DIESEL ENGINE FOR STANDBY PUMP
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HYDRANT HOSE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HYDRANT NOZZLE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HYDRANT BRANCH PIPE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
WATER MONITOR
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
PORTABLE FIRE EXTINGUISHERS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
EVAPORATIVE COOLING UNIT FILLS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
TUBE AXIAL FAN
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
PROPELLER TYPE FAN
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HUMIDISTAT
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
AUTO VISCOUS FILTER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
GRILLS / DIFFUSERS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
PACKAGED TYPE AIR CONDITIONING UNITS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DUCTABLE TYPE AIR CONDITIONING UNITS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
VAM TYPE AIR CONDITIONING UNITS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
ACOUSTIC INSULATION MATERIAL
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
UNDER DECK INSULATION MATERIAL
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
COARSE FILTER & FINE FILTER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
RECIPROCATING TYPE AIR COMPRESSOR
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
OIL LUBRICATED SCREW COMPRESSOR
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HEATLESS TYPE AIR DRYER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
REFRIGERATED TYPE AIR DRYER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
AIR RECEIVER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DEW POINT APPARATUS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
GEAR BOX FOR COOLING TOWER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DRIVE SHAFT
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
DRIFT ELIMINATOR
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
PVC FILM TYPE FILLS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
SPLASH TYPE FILLS (V BAR)
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
SPLASH GRID TYPE FILLS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
FRP FAN CYLINDERS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
COARSE & FINE SCREENS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
SLUICE GATE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
FRP FAN BLADE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HIGH RATE SOLID CONTACT CLARIFIER
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
PRESSURISED UF MEMBRANES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
SUB-MERGED UF MEMBRANES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
MICRON CARTRIDGES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
RO HIGH PRESSURE PUMP
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
RO MEMBRANE
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
TWIN LOBE TYPE BLOWERS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
HYDROCHLORIC ACID TRANSFER PUMPS (POLYPROPYLENE MATERIAL)
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
UPVC PIPES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
CPVC PIPES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
UPVC VALVES (BALL VALVES, GLOBE VALVES, BUTTERFLY VALVES AND DIAPHRAGM VALVES)
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
CPVC VALVES (BALL VALVES, GLOBE VALVES, BUTTERFLY VALVES AND DIAPHRAGM VALVES)
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
UPVC PIPE FITTINGS AND PIPE SUPPORT CLIPS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
CPVC PIPE FITTINGS AND PIPE SUPPORT CLIPS
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
RO PRESSURE TUBES
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certificate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
ANTISCALANT CHEMICAL
- Should be a manufacturer with minimum five (5) years experience
- Should have manufactured & supplied considerable quantity of products in the last two years.
- Should have minimum two (2) products in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- The vendor shall obtain a certifcate from the System Suppliers / End users who are regularly using the vendor’s product in their projects about their feed back on the product.
- Should be manufacturer / Supplier with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of similar or higher capacity, similar scheme for high pressure boiler makup water application in the last two years. The typical capacity of ETP shall shall be 72 cum/hr (1728 cum/day). The typical schem
- Should have minimum two (2) plants of similar or higher capacity, similar scheme for effluent treatment plant (Sugar & Power) in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from
- If the vendor is having experience in sewage treatment plants and water treatment plants, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of the Vendor Registration Committee.
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
PACKAGED TYPE DUCTABLE AIR CONDITIOING SYSTEM
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
VAPOUR ABSORPTION MACHINE BASED AIR CONDITIONING SYSTEM
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
CENTRIFUGAL PUMPS WITH MCW PUMPS
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
Â
CENTRIFUGAL PUMPS WITHOUT MCW PUMPSE
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
RECIPROCATING AIR COMPRESSOR, AIR RECEIVER & AIR DRYER PACKAGE
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
OIL LUBRICATED SCREW COMPRESSOR, AIR RECEIVER & AIR DRYER PACKAGE
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
RCC COUNTER / CROSS FLOW COOLING TOWER
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
FRP COOLING TOWER
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
PULTRUDED FRP COOLING TOWER
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
- Should be manufacturer / Supplier for with minimum five (5) years experience
- Should have supplied minimum of two (2) plants of HACH Spectrophotometer of Model no:DR 2800 or equivalent.
- Should have minimum two (2) systems of similar type & specification for power plant application in satisfactory operating condition for the last two years. Proof shall be submitted in the form of certificate obtained from the respective client.
- If the vendor is having experience in supply of these systems and if they do not have experience specfically for power plant application, then the vendor can be further considered for evaluation for vendor registration based on the recommendation of
- The vendor’s colloborator’s experience in the respective field can also be considered provided the tie-up or colloboration agreement is upto the satisfaction of the Vendor Registration Committee.
GENERATOR PROTECTION RELAYS – COMPOSITE
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years, in which atleast 80 units should have been for generators rating 6.6kV and above.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
FEEDER PROTECTION RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 300 relays of various protections in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relays to be of numeric type with alpha numeric display.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
GENERATOR PROTECTION RELAYS – DISCRETE
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 300 relays of various protections in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relays to be of either microprocessor type or electromechanical type
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
MOTOR PROTECTION RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 relays of various protections in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relays to be of numeric type with alpha numeric display.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
DISTANCE RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay should initiate tripping within 20ms for the Zone-1 fault.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
GRID ISOLATION / VECTOR SURGE / VECTOR JUMP RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 75 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay should initiate tripping within 60ms for the grid failure condition.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
FREQUENCY & DF/DT RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 25 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay should initiate tripping within 20ms for the bus fault.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LOAD SHEDDING RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LOW IMPEDANCE BUSBAR PROTECTION RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 25 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay should initiate tripping within 20ms for the bus fault.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
TRANSFORMER PROTECTION RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
TRANSFORMER DIFFERENTIAL RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
UNDER & OVER VOLTAGE RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
MASTER TRIP & AUXILIARY RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 300 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification
CHECK SYNCHRONISM RELAY
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years for generator application with rating 6.6kV and above.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ROTOR EARTH FAULT RELAY
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years for generator application with rating 6.6kV and above.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
AUTO SYNCHRONIZER
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last three (3) years for generator application with rating 6.6kV and above.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ARC PROTECTION RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 50 units in the last three (3) years.
- Should be of numeric type.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
SENSITIVE EARTH FAULT RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 200 units in the last three (3) years.
- Should be of numeric type and suitable for connecting to CBCT.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
NEUTRAL DISPLACEMENT RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 50 units in the last three (3) years.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay to be suitable for performing in harmonic polluted environment like bus connected with DC drives/induction furnaces etc. Proof for the above for atleast three (3) installations to be furnished.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
AUTO PF CONTROL RELAYS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 50 units in the last three (3) years.
- Should be of microprocessor type.
- Should have auto correction of capacitor values at a regular interval for each step.
- Should have monitoring facility for capacitor healthiness.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Relay should have harmonic compensation algorithm to maintain the set power factor.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ON LOAD TAP CHANGER UPTO 33 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 200 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ON LOAD TAP CHANGER 66 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ON LOAD TAP CHANGER 110-220 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LT MOTORS UPTO 110 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 1000 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LT MOTORS 110-250 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 750 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LT MOTORS 250-600 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LT MOTORS 600-1250 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 25 Nos. in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT MOTORS <250 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 250 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT MOTORS 250-600 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 250 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT MOTORS >600 KW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out type tests as per IS/IEC for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
TRIVECTOR METERS-COMMUNICABLE
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Should have supplied meters for minimum four (4) projects, where energy management system is in service (third party software), during last two (2) years and should be in successful operation.
- Manufacturer should have done minimum Rs 20 Crore turnover per annum for the last three years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
COMPOSITE TVM WITH HARMONIC MEASUREMENT
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Should have supplied meters for minimum four (4) projects, where energy management system is in service (third party software), during last two (2) years and should be in successful operation.
- Meter should be suitable for measuring harmonic level up to 51 order and THD value for both current and voltage parameters.
- Manufacturer should have done minimum Rs 20 Crore turnover per annum for the last three years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
INDICATING METERS – ANALOG
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
- Should have done turnover of Rs 5 Crore per annum for the last three years.
INDICATING METERS – DIGITAL
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
- Should have done turnover of Rs 5 Crore per annum for the last three years.
ENERGY METERS – COMMUNICABLE DIGITAL
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS/IEC for the represented type / model.
- Should have supplied meters for minimum four (4) projects, where energy management system is in service (third party software), during last two (2) years and should be in successful operation.
- Manufacturer should have done minimum Rs 20 Crore turnover per annum for the last three years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
ENERGY MANAGEMENT SYSTEM & SOFTWARE
- Should be a manufacturer with minimum five (5) years experience.
- Should have completed minimum four (4) installations in the last two (2) years, in which minimum two (2) installations were with third party make meters.
- Should have done minimum Rs 1 Crore turnover per annum for the last three (3) years.
ACBS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test & 4000A Temperature rise test within the last 5 years.
- Should have supplied minimum 1000 units during the last three years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
SOFT STARTER
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 units of 400kW in the last 3 years.
- Should have carried out Temperature rise test within the last 3 years for the 400kW unit.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
MCCBS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test & 1600A Temperature rise test within the last 5 years.
- Should have supplied minimum 1000 units during the last three years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
CONTACTORS
- Should be a manufacturer of LV component
- Should have carried out type tests as per IS for each rating/type within last five years.
- Should have been qualified in ACB and MCCB range
BI-METALLIC OVERLOAD RELAYS
- Should be a manufacturer of LV components
- Should have carried out type tests as per IS for each rating/type within last five years.
- Should have been qualified in ACB and MCCB range
MPCBS
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out type tests as per IS for each rating / type with last five (5) years.
- Should have been qualified in ACB and MCCB range.
INTELLIGENT MCC MODULES
- Should be a manufacturer of LV components
- Should have been qualified in ACB and MCCB range
HRC FUSES
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
MICROPROCESSOR BASED OVER LOAD RELAYS
- Should be a manufacturer of LV components
- Should have carried out type tests as per IS for each rating/type within last five years.
- Should have been qualified in ACB and MCCB range
SEMI-CONDUCTOR FUSES
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
SWITCH FUSE / FUSE SWITCH UNITS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
SWITCH DISCONNECTORS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
CHANGE-OVER SWITCHES
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
AUTO CHANGE-OVER SWITCHES
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
MCBS/H4>
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
ELCBS & RCCBS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out type tests as per IS for each range/type within last 5 years
OUTDOOR SWITCHYARD LIGHTNING ARRESTORS 66-220 KV
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
STATION & DISTRIBUTION CLASS ZNO LIGHTNING & SURGE ARRESTORS UPTO 33 KV
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
EARLY STREAM EMISSION (ESE) BASED LIGHTNING PROTECTION SYSTEM
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test within the last 5 years.
- Should have supplied minimum 50 units during the last two years
DISTRIBUTION NETWORK SURGE PROTECTION DEVICES / SURGE PROTECTION DEVICES (SPD)
- Should be a manufacturer, with minimum three (3) years experience.
- Should have carried out type tests as per IS/IEC for the represented type / model.
SWAGED POLES
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied minimum 300 poles during last two years.
OCTAGONAL POLES
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied minimum 300 poles during last two years.
LIGHTING MASTS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied minimum 50 masts during last two years.
LUMINARIES & LAMPS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP65 enclosure for outdoor fittings.
ISOLATOR UPTO 33 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out 25 kA short circuit test & 800A Temperature rise test within the last 5 years.
ISOLATORS – 66-132 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out 31.5 kA short circuit test & 1600A Temperature rise test within the last 5 years.
ISOLATORS – 220 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 units in the last 3 years.
- Should have carried out 40 kA short circuit test & 2000A Temperature rise test within the last 5 years.
POST INSULATORS UPTO 33 KV
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test & cantilever strength test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
POST INSULATORS 66-220 KV
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test & cantilever strength test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
CONDENSER BUSHINGS
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test & cantilever strength test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
STRING INSULATOR SETS
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test & cantilever strength test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
ROD INSULATORS 66-220 KV
- Should be a manufacturer, with minimum five (5) years experience.
- Should have carried out impulse test & cantilever strength test within the last 5 years.
- Should have supplied minimum 1000 units during the last two years
HV & EHV CIRCUIT BREAKERS OUTDOOR BREAKERS UPTO 33 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 breakers in the last 3 years.
- Should have carried out 25 kA short circuit test & 1250A Temperature rise test within the last 5 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HV & EHV CIRCUIT BREAKERS 66-132 KV SF6 BREAKERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 breakers in the last 3 years.
- Should have carried out 31.5 kA short circuit test & 1600A Temperature rise test within the last 5 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HV & EHV CIRCUIT BREAKERS 220 KV SF6 BREAKERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 breakers in the last 3 years.
- Should have carried out 40 kA short circuit test & 2000A Temperature rise test within the last 5 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
LAVT / LAPT PANELS
- Should be a manufacturer of LAVT / LAPT, with minimum five (5) years experience.
- Should have carried out impulse & IP42 test within the last 5 years.
- Should have supplied minimum 10 units during the last two years
NEUTRAL GROUNDING RESISTOR PANELS
- Should be a manufacturer of NGR panels, with minimum five (5) years experience.
- Should have carried out temperature rise, impulse & IP42 test within the last 5 years.
- Should have supplied minimum 10 units during the last two years
HT GENERATOR TERMINAL CUBICLES
- Should be a manufacturer of HT Generator terminal Cubicles, with minimum five (5) years experience.
- Should have carried out impulse & IP42 test within the last 5 years.
- Should have supplied minimum 10 units during the last two years
NEUTRAL GROUNDING TRANSFORMER PANELS
- Should be a manufacturer of NGTR panels, with minimum five (5) years experience.
- Should have carried out temperature rise, impulse & IP55 test within the last 5 years.
- Should have supplied minimum 10 units during the last two years
EARTHING TRANSFORMERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 transformers in the last 3 years.
LT GENERATORS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 200 units in the last 3 years.
- Should have carried out Sudden short circuit test & Temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT GENERATOR UPTO 10MW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last 3 years.
- Should have carried out Sudden short circuit test & Temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT GENERATOR 10-40MW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last 3 years.
- Should have carried out Sudden short circuit test & Temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
HT GENERATOR >40MW
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last 3 years.
- Should have carried out Sudden short circuit test & Temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
CABLE TRAYS – GI
- Should be a manufacturer with minimum three (3) years experience, with hot dip galvanising unit.
- Should have turn-over of min.Rs.100 lakhs per annum, for the last three years.
LIGHTING TRANSFORMERS
- Should be a manufacturer with minimum three (3) years experience for dry type transformers.
- Should have supplied similar units of minimum 10 numbers, during the last 2 years.
LOCAL PUSH BUTTON STATIONS – FRP
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP65 enclosure.
- Should have supplied minimum 500 numbers, during the last two years.
LIGHTING JUNCTION BOXES – FRP
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP65 enclosure.
- Should have supplied minimum 500 numbers, during the last two years.
FUSE DISTRIBUTION BOARDS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
MCCB DISTRIBUTION BOARDS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
ISOLATOR BOXES
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
WELDING SOCKETS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
POWER SOCKETS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
MCB DISTRIBUTION BOARDS
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP55 enclosure.
- Should have supplied minimum 50 numbers, during the last two years.
LIGHTING JUNCTION BOXES – CAST ALUMINIUM
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied / type tested for IP65 enclosure.
- Should have supplied minimum 1000 numbers, during the last two years.
DIESEL ENGINE UPTO 500 KVA
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied similar units of minimum 50 numbers, during the last 2 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification
DIESEL ENGINE UPTO 2000 KVA
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied similar units of minimum 25 numbers, during the last 2 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
DG ALTERNATORS – 415V
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied similar units of minimum 50 numbers, during the last 2 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification
DG ALTERNATORS – HT
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied similar units of minimum 10 numbers, during the last 2 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification
DC DISTRIBUTION BOARDS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 25 kA short circuit test & 400A Temperature rise test within the last 5 years.
- Should have supplied similar units of minimum 10 numbers for power plant / sub-stations, during the last 2 years.
DG CONTROLLER WITH ENGINE CONTROLS, ALTERNATOR PROTECTIONS, AMF, SYNCHRONISATION & LOAD SHARING
- Should be a manufacturer with minimum three (3) years experience.
- Should have supplied similar units of minimum 25 numbers, during the last 2 years.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification
VRLA BATTERIES
- Should be a Manufacturer of similar type of batteries with minimum 3 years experience.
- Should have executed minimum 10 units of batteries with ratings not less than 500AH for power plant / sub-station applications, during the last 2 years.
NI-CD BATTERIES
- Should be a Manufacturer of similar type of batteries with minimum 3 years experience.
- Should have executed minimum 10 units of batteries with ratings not less than 500AH for power plant / sub-station applications, during the last 2 years.
PLANTE BATTERIES
- Should be a Manufacturer of similar type of batteries with minimum 3 years experience.
- Should have executed minimum 10 units of batteries with ratings not less than 500AH for power plant / sub-station applications, during the last 2 years.
LEAD-ACID BATTERIES
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
IGBT / SMPS BASED BATTERY CHARGERS
- Should be a Manufacturer of similar type of battery chargers with minimum 3 years experience.
- Should have executed minimum 10 units of battery chargers with ratings not less than 100A for power plant / sub-station applications, during the last 2 years.
DC DISTRIBUTION BOARDS
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 25 kA short circuit test & 400A Temperature rise test within the last 5 years.
- Should have supplied similar units of minimum 10 numbers for power plant / sub-stations, during the last 2 years.
EMERGENCY OIL PUMP STARTERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied similar units of minimum 10 numbers for power plant applications, during the last 2 years.
THYRISTOR BASED BATTERY CHARGERS
- Should be a Manufacturer of similar type of battery chargers with minimum 3 years experience.
- Should have executed minimum 10 units of battery chargers with ratings not less than 100A for power plant / sub-station applications, during the last 2 years.
- Should be a Manufacturer of similar type of battery chargers with minimum 3 years experience.
- Should have executed minimum 10 units of battery chargers with ratings not less than 100A for power plant / sub-station applications, during the last 2 years.
GENERATOR PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have supplied minimum 10 panels of this category during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
TRANSFORMER PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have supplied minimum 10 panels of this category during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
SYNCHRONISATION PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have supplied minimum 10 panels of this category during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
LINE PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
PLC BASED LOAD SHARING & SYNCHRONISATION PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have supplied minimum 4 panels of this category during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
LOAD SHEDDING PANELS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.2 Crore turn-over (control, relay & metering panels alone) during the last 2 years.
- Should have supplied minimum 2 panels of this category during the last 2 years.
- Should have carried out IP52 test within the last 5 years.
LT CTS (UPTO 2000A) – CAST RESIN TYPE
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test and 2000A Temperature rise test within the last 5 years.
- Should have supplied min. 250 numbers of rating above 1000A ratio during the last one year.
LT CTS (2000-5000A) – CAST RESIN TYPE
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test and 4000A Temperature rise test within the last 5 years.
- Should have supplied min. 50 numbers of rating above 3000A ratio during the last one year.
HT CTS (UPTO 1000A) UPTO 33 KV (INDOOR) – CAST RESIN TYPE
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 40 kA short circuit test and 1000A Temperature rise test within the last 5 years.
- Should have supplied min. 200 numbers during the last one year.
HT CTS (1000A-3000A) UPTO 33 KV (INDOOR) – CAST RESIN TYPE
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 40 kA short circuit test and 3000A Temperature rise test within the last 5 years.
- Should have supplied min. 50 numbers during the last one year.
HT PTS UPTO 33 KV – OUTDOOR
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied min. 50 numbers during the last one year.
HT CTS UPTO 33 KV – OUTDOOR
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 25 kA short circuit test and 500A Temperature rise test within the last 5 years.
- Should have supplied min. 50 numbers during the last one year.
66 KV OUTDOOR CTS & PTS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 250 numbers in the last 3 years.
- Should have carried out Impulse Test, accuracy class & temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
110-132 KV OUTDOOR CTS & PTS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 250 numbers in the last 3 years.
- Should have carried out Impulse Test, accuracy class & temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
220 KV OUTDOOR CTS & PTS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 numbers in the last 3 years.
- Should have carried out Impulse Test, accuracy class & temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
66-220 KV CVTS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 numbers in the last 3 years.
- Should have carried out Impulse Test, accuracy class & temperature rise test for the represented ratings.
- In case the vendor has manufacturing facility with design, manufacturing & quality collaboration, Collaborator’s experience will be considered for qualification.
415V/690V BUSDUCTS – <1600A
- Should be a manufacturer with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test, 1600A Temperature rise test & IP42 test within the last 5 years.
- Should have supplied atleast 100m length during the last one year.
415/690V BUSDUCTS – 2000-6000A
- Should be a manufacturer of busduct with Aluminium enclosures, with minimum five (5) years experience.
- Should have carried out 50 kA short circuit test, 4000A Temperature rise test & IP42 test within the last 5 years.
- Should have supplied atleast 100m length during the last one year
HT-SEGREGATED BUSDUCTS
- Should be a manufacturer of busduct with Aluminium enclosures, with minimum five (5) years experience.
- Should have carried out 40 kA short circuit test, 3000A Temperature rise test & IP42 test within the last 5 years.
- Should have supplied atleast 100m length during the last one year
Â
HT-ISOLATED PHASE BUSDUCTS
- Should be a manufacturer of busduct with Aluminium enclosures, with minimum five (5) years experience.
- Should have carried out 65 kA short circuit test, 5000A Temperature rise test & IP42 test within the last 5 years.
- Should have supplied atleast 100m length during the last one year
ANALOG – BRUSHLESS EXCITATION SYSTEM, UPTO 20A
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 units in the last 3 years for generators in parallel with grid.
DIGITAL – BRUSHLESS EXCITATION SYSTEM UPTO 15A
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last 3 years for generators in parallel with grid.
DIGITAL – BRUSHLESS EXCITATION SYSTEM – 15A-100A
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 30 units in the last 3 years for generators in parallel with grid.
DIGITAL – STATIC EXCITATION SYSTEM – UPTO 1000A
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 units in the last 3 years for generators in parallel with grid.
LV SYSTEM CONTRACTS OTHER THAN SWITCHYARD, TRANSMISSION LINE & SUPPLY OF TRANSFORMERS, PANELS & CABLES
- Should be Contractor with minimum 5 years in Electrical Contracts.
- Should have executed minimum 3 projects of order value above Rs.100 lakhs, during the last 3 years.
- Should have exeucted atleast one project in the last five years for thermal based power plants.
- Should have minimum organisation turn-over of Rs.3 Crore
HV & LV SYSTEM CONTRACTS (OTHER THAN SWITCHYARD & TRANSMISSION LINE) INCLUDING SUPPLY OF TRANSFORMERS, PANELS & CABLES
- Should be Contractor with minimum 5 years in Electrical Contracts.
- Should have executed minimum 2 projects of order value above Rs.500 lakhs, during the last 3 years.
- Should have exeucted atleast one project in the last five years for thermal based power plants.
- Should have minimum organisation turn-over of Rs.10 Crores
EHV SYSTEM INCLUDING SWITCHYARD, TRANSMISSION LINE & TRANSFORMERS
- Should be Contractor with minimum 5 years in Switchyards & Transmission Lines, above 66 kV level.
- Should have executed minimum 2 projects of order value above Rs.10 Crores, during the last 3 years.
- Should have executed on EPC basis minimum 5 switchyards & 25 km transmission line above 66 kV, during the last 5 years.
- Should have minimum organisation turn-over of Rs.10 Crores.
TURNKEY (EHV/HV/LV) ELECTRICAL SYSTEM INCLUDING TRANSMISSION LINES
- Should be Contractor with minimum 5 years in Plant Electrical System and Switchyards & Transmission Lines, above 66 kV level.
- Should have executed on EPC basis minimum 5 switchyards & 25 km transmission line above 66 kV, during the last 5 years.
- Should have exeucted atleast two projects in the last five years for Thermal power plants.
- Should have minimum organisation turn-over of Rs.20 Crores.
TURNKEY (EHV/HV/LV) ELECTRICAL SYSTEM EXCLUDING TRANSMISSION LINES
- Should be Contractor with minimum 5 years in Switchyards above 66 kV level & Plant Electrification Systems.
- Should have executed on EPC basis minimum 5 switchyards, during the last 5 years.
- Should have exeucted atleast two projects in the last five years for Thermal power plants.
- Should have minimum organisation turn-over of Rs.15 Crores.
TRANSMISSION LINE 66 KV TO 220 KV
- Should be transmission tower & line contractor with minimum 5 years experience.
- Should have executed minimum 100 km transmission lines, during the last 3 years.
- Should have organisation turn-over for transmission lines alone of minimum Rs.5 Crores.
TRANSMISSION LINE 33 KV
- Should be transmission line contractor (with poles) with minimum 5 years experience.
- Should have executed minimum 100 km transmission lines, during the last 3 years.
- Should have organisation turn-over for transmission lines alone of minimum Rs.100 Lakhs.
- Should have facility to manufacture under triple extrusion dry cure process.
DG SETS LESS THAN 500 KVA
- Should have minimum five (5) years experience in execution of DG projects.
- Should have executed minimum 5 jobs on EPC basis during last 2 years.
- Should have organisation turn-over of minimum Rs.3 Crores.
DG SETS UPTO 2000 KVA
- Should have minimum five (5) years experience in DG projects.
- Should have executed minimum 5 jobs on EPC basis during last 2 years.
- Should have organisation turn-over of minimum Rs.3 Crores.
CONTROL CABLES
- Should be Manufacturer of PVC-copper cables with minimum 3 years experience.
- Should have executed minimum Rs.10 Crores cable orders, for the last 2 years
LV POWER CABLES
- Should be Manufacturer of XLPE cables with minimum 3 years experience.
- Should have executed minimum Rs.25 Crores cable orders, for the last 2 years.
EHV CABLES
- Should be Manufacturer of EHV-XLPE cables with minimum 3 years experience.
- Should have executed minimum Rs.25 Crores cable orders, for the last 2 years.
HV (UPTO 33 KV) CABLES
- Should be Manufacturer of HV-XLPE cables under dry cure process with minimum 3 years experience.
- Should have executed minimum Rs.25 Crores cable orders, for the last 2 years.
- Should be a manufacturer of panels or drives with minimum five (5) years experience.
- Should have minimum Rs.5 Crores turn-over (in case of panel manufacturer) during the last 2 years.
- Should have carried out 50 kA short cirucit test, 4000A Temperature rise test and IP42 test within the last 5 years.
- Should have executed ACVF panels of minimum 200 kW – 10 numbers during the last 3 years.
PCCS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.5 Crores turn-over (panels division alone, other than busducts) during the last 2 years
- Should have carried out 50 kA short cirucit test, 4000A Temperature rise test & IP42 test within the last 5 years.
DRAW-OUT MCCS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.5 Crores turn-over (panels division alone, other than busducts) during the last 2 years.
- Should have carried out 50 kA short cirucit test, 1250A Temperature rise test & IP52 test within the last 5 years.
- Reference list to be furnished for the last 3 yeas(Minimum 5 references)
NON DRAW-OUT MCCS
- Should be a manufacturer with minimum five (5) years experience.
- Should have minimum Rs.3 Crores turn-over (panels division alone, other than busducts) during the last 2 years.
- Should have carried out 50 kA short cirucit test, 1250A Temperature rise test & IP52 test within the last 5 years.
HT PANELS 33 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 panels in the last 3 years.
- Should have carried out 25 kA short cirucit test & 1250A Temperature rise test within the last 5 years.
HT PANELS UP TO 11 KV
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 100 panels in the last 2 years.
- Should have carried out 40 kA short cirucit test & 3150A Temperature rise test within the last 5 years.
SWITCHYARD UPTO 33 KV
- Should be Contractor with minimum 5 years in Switchyard Contracts business.
- Should.have executed minimum 2 switchyards of order value above Rs.50 lakhs of each on EPC basis, during the last 5 years.
SWITCHYARD 66 KV TO 132 KV
- Should be Contractor with minimum 5 years in Switchyard Contracts business.
- Should have executed minimum 5 switchyards of order value above Rs.100 lakhs of each on EPC basis, during the last 5 years.
SWITCHYARD 220 KV & ABOVE
- Should be Contractor with minimum 5 years in Switchyard Contracts.
- Should have executed minimum 5 switchyards of order value above Rs.200 lakhs of each on EPC basis, during the last 5 years.
220 KV CLASS & ABOVE TRANSFORMERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 10 transformers in the last 3 years.
- Should have carried out Impulse Test & Temperature rise test for represented ratings.
66 KV TO 132 KV CLASS TRANSFORMERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 20 transformers in the last 3 years.
- Should have carried out Impulse Test & Temperature rise test for represented ratings.
33 KV CLASS – OIL COOLED TRANSFORMERS
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 20 transformers in the last 3 years.
- Should have carried out Impulse Test & Temperature rise test for represented ratings.
415 V DISTRIBUTION TRANSFORMER – OIL COOLED
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 50 transformers in the last 3 years.
- Should have carried out Temperature rise test for represented ratings.
415 V DISTRIBUTION TRANSFORMER – DRY TYPE
- Should be a manufacturer with minimum five (5) years experience.
- Should have supplied minimum 50 transformers in the last 3 years.
- Should have carried out Temperature rise test for represented ratings.