Avant-Garde have prepared / are preparing detailed project reports for the following projects. These projects are captive power plants for the sponge iron / steel industry which are either connected to grid or installed for in-house captive power generation.
S.No | Project | Capacity |
---|---|---|
1 | Shyam Steel Ltd., West Bengal (Burdhwan) (3 x 50 TPD Kilns WHRSG + FBC) Grid paralleled inhouse use of Electric power. | 5.00 MW |
2 | Shyam Steel Ltd., West Bengal (Mangalpur) (3 x 100 TPD Kilns WHRSG) Grid paralleled inhouse use of Electric power. | 8.00 MW |
3 | Jai Balaji Sponge Ltd., West Bengal (Ranigunj) (7 x 50 TPD Kilns WHRSG + FBC) In-house usage of electric power. | 12.00 MW |
4 | Sri Ram Rupai Balaji Ltd., West Bengal (4 x 100 TPD Kilns WHRSG + 1 CFBC boiler) In-house usage of electric power . | 30.00 MW |
5 | Adhunik Corporation Ltd., West Bengal (Durgapur) (3 x 100 TPD Kilns WHRSG + FBC) Grid paralleled inhouse use of electric power | 16.00 MW |
6 | Ankit Steel Works Pvt.Ltd., West Bengal (Bankura) (1 x 350 TPD Kilns WHRSG) Grid paralleled inhouse use of electric power. | 8.50 MW |
7 | Electrosteel Castings Limited, Haldia, West Bengal (2 Batteries of 34 coke ovens WHRSG) Grid paralleled inhouse use & export of electric power. | 12.00 MW |
8 | Neo Metallicks Ltd., Durgapur, West Bengal (BFG based captive power plant-Stage-1) | 4.50 MW |
9 | Ma Chandi Durga Ispat Pvt. Ltd., Durgapur, West Bengal (2 x 100 TPD + 3 x 50 TPD Kilns WHRSG) In-house usage of electric power. | 8.50 MW |
10 | Ma Chandi Durga Ispat Pvt. Ltd., Durgapur, West Bengal (2 x 100 TPD + 3 x 50 TPD Kilns WHRSG) In-house usage of electric power. | 40.00 MW |
11 | Rashmi Ispat (I) Ltd., Midnapore dist., West Bengal 3 x 100 TPD kiln, WHSRG + 1 FBC boiler | 10.00 MW |
12 | Bihar Sponge Iron Ltd., Jamshedpur, (1 x 500 TPD kiln WHRSG + 1 x 100 TPD kiln WHRSG) Grid paralleled export of power | 18.00 MW |
13 | Singhal Enterprises Pvt. Ltd., Chhatisgarh (Raigarh), (4 x 100 TPD Kilns WHRSG + FBC) Grid paralleled inhouse use of Electric power. | 16.00 MW |
14 | Satya Power and Ispat Ltd, Chhattisgarh (2 x 100 TPD Kilns WHRSG + 1 AFBC) Grid paralleled inhouse use of electric power. | 12.00 MW |
15 | Jai Balaji Jyothi Steels Ltd, Orissa (2 x 30MW) (8 x 100 TPD Kilns WHRSG + 2 CFBC) in-house usage of electric power with grid connection | 60.00 MW |
16 | Neepaz Metaliks Limited (Adhunik Group), Orissa (5x100 TPD kilns WHRSG + 1 FBC boilers) Grid parallelled inhouse use of power | 34.00 MW |
17 | Adhunik Alloys & Power Ltd., Jharkhand (2 x 350 TPD Kilns WHRSG + 2 AFBC) Grid paralleled inhouse use of electric power. | 25.00 MW |
18 | Sunvik Steel Private Ltd., Karnataka (2 x 100 TPD Kilns WHRSG + 1 AFBC) Grid paralleled inhouse use of electric power. | 10.00 MW |
19 | BMM Ispat Limited, Karnataka (2 x 100 TPD kilns WHRSG + 1 FBC boilers) Grid parallelled inhouse use of power | 25.00 MW |
20 | Gupta Metalicks & Power Ltd., Nagpur, Maharashtra (4x100 TPD kilns WHRSG + 2 FBC boilers) Grid parallelled inhouse use of power | 40.00 MW |
21 | Gallant Metal Limited, Gandhidham, Gujarat. (3x100 TPD kilns WHRSG + 1 FBC boiler) Grid parallelled inhouse use of power) | 25.00 MW |
22 | Bhatia International, Gummidipoondi, Chennai Coke oven gas fired boilers (2 nos of 20 TPH) | 9.00 MW |
TOTAL | 428.50 MW |
S.No | Project | Capacity | Fuel |
---|---|---|---|
1 | Kamachi Sponge Iron Ltd, Gummidipoondi, Tamil Nadu | 10 MW | Waste Heat Recovery |
2 | Kalyani Gerdau Steels Ltd., Tadipatri, Andhra Pradesh | 6 MW | Blast Furnace gas |
3 | Sunvik Steels Private Limited, Karnataka | 10 MW | WHRB, Coal / Char / AFBC |
4 | Dhruvdesh Metasteel Private Limited, Koppal, Karnataka | 10 MW | Coal / kiln hot gas / AFBC |
5 | Aarti Steels Ltd., Orissa (Phase – I ) | 40 MW | Washery rejects, coal, char /AFBC |
6 | Adhunik Metalliks Ltd., Rourkela, Orissa | 2 X 17 MW | Coal / Char / Washery Rejects / CFBC |
7 | Action Ispat & Power (P) Ltd., Jharsuguda, Orissa | 12 MW | Coal / Char / Washery Rejects |
8 | OCL Limited, Orissa | 14 MW | Washery Rejects / Coal/ Char |
9 | OCL Ltd., Rajgangpur | 2 X 27 MW | Indian Coal / Washery Rejects |
10 | Aarti Steels Ltd., Phase -II, Orissa | 50 MW | Char / coal, washery rejects / CFBC |
11 | MGM Steels Limited, Orissa | 8 MW | Kiln hot gas |
12 | Rungta Mines Limited, Kamando, Orissa | 2 X 20 MW | Coal / Dolochar & Hot Gas / AFBC |
13 | Adhunik Ferro Alloys Ltd., Jamshedpur, Jharkhand | 16 MW | Waste heat recovery and AFBC |
14 | AML Steel and Power (P) Ltd, Jamshedpur, Jharkhand | 9.6 MW | Waste heat recovery |
15 | Kohinoor Steels Ltd Jamshedpur, Jharkhand | 17 MW | Waste heat recovery, Dolochar |
16 | Rungta Mines Limited, Chaliyama, Jharkhand | 2 X 20 MW | Coal / Dolochar & hot gas / AFBC |
17 | Gallant Metals Ltd., Gorakhpur, UP | 18 MW | Waste heat recovery, Dolochar / coal / AFBC |
18 | Shri Ramrupai Balaji Steels Ltd, Durgapur, West Bengal | 2 X 25 MW | Waste heat, recovery, Dolochar & Washery Rejects / CFBC |
19 | Jai Balaji Sponge Iron Ltd., West Bengal | 12 MW | Waste heat recovery & AFBC |
20 | Electro Steel Castings Ltd., West Bengal | 3.5 MW | BFG / Oil |
21 | Neo Metaliks Limited, Kolkata | 4.5 MW | BFG |
22 | Supersmelters Limited, West Bengal | 35 MW | WHRB & Coal / Char / Washery / CFBC |
23 | Ind Synergy Limited., Raipur | 50 MW | Coal / Char / Washery Rejects / CFBC |
24 | Govind Ispat Ltd, Chhattisgarh | 15 MW | Waste heat recovery and AFBC |
25 | Shri Shyam Ispat (India) Private Limited, Chhattisgarh | 17 MW | Coal / Kiln hot Gas / AFBC |
26 | Gallant Metals Limited, Ahmedabad | 25 MW | Coal / Kutch, Kutch Lignite / AFBC |
27 | SWIL Ltd, Gujarat | 15 MW | Furnace Oil |
28 | Bhushan Power & Steel Limited | 2 X 8 MW | Coke oven gas based waste heat recovery |
29 | Bhushan Power & Steel Limited, Rengali, Orissa | 130 MW | Coal / Char / CFBC |
30 | Gerdau Steels Ltd., Tadipatri, Andhra Pradesh | 15 MW | Coke Oven Gas (WHRSG) |
31 | Abhijeet Infrastructure Ltd, Jharkhand | 2 X 30 MW | Coal / Char / Washery / CFBC |
32 | Corporate Ispat alloys Limited, Saraikela, Jharkhand | 2 X 30 MW | WHRB, Coal based / CFBC |
33 | SPS Steel & Power Ltd., Jharsuguda, Orissa | 30 MW & 40 MW | Indian Coal / Char / CFBC |
34 | Singhal Enterprises., Chhattisgarh | 7.2 MW | Waste heat recovery from sponge iron plant |
35 | Salasar Steel & Power Ltd., Raigarh, Chattisgarh | 63 MW | Washery rejects / Char / Coal / CFBC |
36 | Concast Ispat Limited, Rourkela | 18 MW | WHRB, Coal based |
37 | Rungta Mines Limited, Chaliyama | 20 MW | WHRB, Coal based |
38 | Rungta Mines Limited, Dhenkanal, Phase I | 25 MW | WHRB, Coal based |
39 | Rungta Mines Limited, Dhenkanal, Phase II | 35 MW | WHRB. Coal based |
40 | Rungta Mines Limited, Karakola | 20 MW | WHRB, Coal based |
41 | Rungta Mines Limited, Chaliyama, Jharkhand | 2 x 40MW | WHRB, Coal based |
42 | Rungta Mines, Kamando | 20 MW | WHRB, Coal based |
43 | Electrosteel Castings, Ltd, West Bengal | 5 MW | WHRB, Coal based |
Total | 1459.80MW |
S.No | Project | Capacity | Fuel |
---|---|---|---|
1 | Bhushan Power & Steel Limited, Rengali, Orissa | 8 MW | Coal |
2 | B.S. Sponge Private Limited | 15 MW | Char / Washery |
3 | Chandil Power Private Limited | 20 MW | Hot Kiln Gas & AFBC (Char/Washery) |
4 | Sandeep Energy & Steel S.A. (SEAS), Mali, Africa | 25 MW | Coal |
5 | Bhatiya International | 15MW | Coke oven |
6 | Bhushan Power & Steel Limited, Nova | 14 MW | Coal |
7 | Supersmelters Limited, West Bengal | 35 MW | WHRB & Coal / Char / Washery |
8 | Rungta Mines Limited, Kamanda | 2 x 45.5 MW | Coal CFBC |
9 | Rungta Mines Limited, Dhenkanal | 2 x 25 MW | WHRB & CFBC |
10 | Rungta Mines Limited, Dhenkanal Phase-II | 50 MW | WHRB & CFBC |
11 | Rungta Mines Limited, KaraKolha | 1 x 22 MW | WHRB & CFBC |
12 | Sunvik Steels Pvt. Ltd | 7 MW | WHRSG |
13 | Electro Steel Castings Ltd., West Bengal | 5MW | Coke oven WHRB |
14 | Rungta Mines Limited, Kamanda | 20 MW | Coal |
15 | Rungta Mines Limited, Kamanda | 1 x 45.5 MW | Coal |
16 | Rungta mines Chaliyama | 2x 20 MW 1X 20 MW2X40 MW 1X30 MW 2 X65 MW | WHRB & AFBC WHRB CFBC COKE OVEN WHRB WHRB |
17 | MGM Minerals Limited | 24 MW | WBRB & CFBC |
18 | Crackers India Alloys Limited | 10 MW | WHRB & AFBC |
Total | 584.5 MW |