S.NoProjectCapacity (MW)
1Shriram Energy Systems Ltd, Andhra Pradesh – 650 TPD MSW & 250 TPD RDF – commissioned in 20036
2Delhi MSW Solutions Ltd, Delhi – 1200 TPD RDF based WtE Plant – Commissioned in the year 201624
3Hyderabad Integrated MSW Ltd, Jawahar Nagar, Hyderabad – Phase I - 1200 TPD WtE Plant commissioned in the year 202019.8
4Hyderabad MSW Energy Solution Pvt Ltd, Gachibowli,
Hyderabad - Landfill Gas (LFG) Project

LFG Extraction and Compressed Bio Gas (CBG) Plant - 750 cum/hr Landfill Gas into CBG of 337.5 cum/hr bottling capacity – Commissioned in the year 2021
-
5Providing Design and Detailed Engineering Services for Flue Gas Ducting for RDF fired boiler and Stack -  on account of M/s. Jurong Engineering Limited – 10 MW WtE in Thailand-
6Tuff Offshore, Singapore – Providing Pre-Bid Engineering Services for 2 x 600 TPD WtE project / 35.2 MW-
Total49.8
S.NoProjectCapacity (MW)
1Pallavapuram Tambaram MSW Private Limited, Chennai (Essel Infra - RDF based Power Plant) – 300 TPD5
2Rewa MSW Holding Limited, Rewa – 310 TPD (Ramky Group)6
3Pune Bio-Energy Systems Private Limited, Pune – 1x 800 TPD14
42 x 600 TPD MSW based Power Plant at  HI MSW (Ramky Group) Jawaharnagar –  Phase II 24
51 x800 TPD MSW based Power Plant at Dundigal – Phase III  (Ramky Group)15
6Chennai MSW (P) Limited, Deonar – 350 TPD RDF based WtE Plant (Waste Handling Capacity is 600 TPD)6.4
7KPC Gas Power Corporation Ltd - Review Engineering Services for the proposed 11.5MW WtE Project at Bidadi, Ramanagara Dist, Karnataka11.5
8Uttam energy Limited  - Design of 350 TPD WtE boiler, design and detailed engineering of BOP and detailed engineering of E & I 6.4
9Abellon CleanEnergy Limited - Due Diligence Study for the Existing 7.5 MW (with 45 TPH Boiler) RDF based WtE Plant at Jamnagar, Gujarat-
10Kalpataru Power Transmission Ltd - Evaluating the Techno-Commercial aspects of the Contract Document for the implementation of 500 TPD WtE Project in Maldives-
Total88.3
S.NoProjectCapacity (TPD)
1RDF Power Projects Limited, Nalagonda 2 X 600
2Timarpur-Okhla Waste Managmenet Co. Pvt. Ltd, New Delhi (C/o.IL & FS, New Delhi) MSW and Biomethanisation Plant1 X 1300
3East Delhi Waste Processing Co. Pvt. Ltd., Ghazipur – for IL & FS1 X 1300
4Delhi MSW Solutions Ltd, (Group of Ramky Energy, Delhi)2 X 600
5Hi MSW Ltd, (Group of Ramky Energy, Hyderabad)2 X 600
6Guwahati Waste Management Company Pvt.Ltd, (Group of Ramky), Guwahati1 X 600
7Ramky Energy & Environment Ltd, Bangalore1 X 600
8Ramky Enviro Engineers Ltd, Pimpri1 X 600
9IL&FS Energy Development Company Limited, Gurgaon (Puducherry Project) 1 X 600
10Pune Bio-Energy Systems Private Limited, Pune2 X 375
11Rewa MSW Holding Limited, Rewa1 X 310
12Dehradun Waste Management Private Limited, Dehradun1 X 200
13Siemens Limited, Chennai2 x 600
14Hyderabad MSW Energy Solutions Private Limited, Jawaharnagar – Phase II 2 x 600
15Hyderabad MSW Energy Solutions Private Limited, Dundigal – Phase III 2 x 500
16Thane Clean Environment Private Limited, Thane1 x 800
17Bharuch Enviro Infrastructure Limited, Coimbatore - Preparation of Concept Note for the implementation of RDF to Energy Plant1 x 450 
18KPC Gas Power Corporation Ltd - preparation of Concept Note on Legacy Waste Management WtE Plant at Mangalore___
19KPC Gas Power Corporation Ltd – preparation of Pre-feasibility report for establishment of Waste to energy comparing incineration Vs Bio-methanisation project at Pachachanadi, Mangaluru ___
20KPC Gas Power Corporation Ltd – Preparation of DPR for establishment of WtE project at Mavallipura Waste Processing Plant of BBMP, Yelahanka, Bengaluru, Karnataka___
21Engineering assessment for existing 12MW RDF based WtE plant to improve plant performance & PLF of IL&FS A/c. East Delhi Waste Processing Company Ltd12MW
22Siddivinayak Tradelinks - DPR for 2x1000 TPD MSW Plant2x1000
23M/s. ZIGMA Global Environ Solutions Pvt. Ltd., Erode, Tamilnadu – Preparation of Feasibility Report for 500, 750 & 1000 TPD WtE Project and Preparation of Detailed Project Report for 750 TPD WtE Plant – for various Locations1 x 500